| ||||
|

![]() | This complex consists of 5 buildings each 5 floors high . In an interior space there is a small garden and swimmimg pool. Complete with a lift in every building. Recent construction which began in 2000 the last phase will be completed and finished for May 2001. Here are the details of what the apartments are equipped with: Apartment Capacity 4/6 persons o Salon / Dining room with sofa-bed for 2 persons. o 2 double bedrooms ( 1with 2 separate beds and 1 with a double bed.) o Kitchen is equipped with a vitro ceramic, oven, washing machine and fridge. o 2 bathrooms. o Grand terrace o T.V. Colour o Air conditionning o Central Heating Apartment Capacity 6/8 persons ( Same description as the apartment 4/6 but instead of two double bedrooms there are three.) |
